Latitude: 15º 15' 00" S
Longitude: 75º 14' 30" W
Port Location and Influence Area:
The port of San Nicolás is an Iron Ore loading facility operated by Shougang-Hierro Perú, the main Peruvian iron mine, which is located at San Juan de Marcona, some 20 kmrs. To the South of the port. The finger pier is of easy access as is located over the South coast of the San Nicolás Bay, in a clean and deep area, suitable for cape size vessels.
Port Restrictions: (see official restrictions)
Port Infrastructure:
The pier is 327.60 mtrs. Long and has an extension mooring dolphin (15 mtrs. Diam.) for the stern lines of panamax and capers. The pier is 15 mtrs. wide and has berth available at either side. However, due to its loading belt conveyor, only general cargo is allowed on the East side.
The West side is used to load vessels of up to 320 Mtrs. LOA and 240,000 DWT. Ships are loaded by means of a conveyor belt (ore loader) on gantry on rails, which runs almost all the pier length, to avoid shifting of vessels during loading.
Pilotage:
Compulsory for all vessels. Pilots boarding area is approximately 1 mile North of mooring dolphin. Vessels are moored by means of their own engines and anchors, which are dropped abeam of dolphin were an "anchor pocket" is available (see mooring diagram).
Working Hours:
The port operates 24 hrs/day SHINC, i.e. from 07:00-16:00/16:00-24:00/00:00-07:00 hrs.
Average Loading Rates:
Iron Ore Grade
Stowage Factor
Loading Rate
(about - w.o.g.)
(about - w.o.g.)
Blast furnace pellets
0.461 m3 / MT
10,000 MT / shift of 12 hours
Pellets for direct reduction
0.461 m3 / MT
10,000 MT / shift of 12 hours
High grade sinter feed (fines)
0.320 m3 / MT
20,000 MT / shift of 12 hours
Pellet feed (filter cake)
0.306 m3 / MT
20,000 MT / shift of 12 hours
Calibrated (lump)
0.325 m3 / MT
12,500 MT / shift of 12 hours
Pellets chips
0.425 m3 / MT
12,500 MT / shift of 12 hours
Port Facilities:
Bunkers
No
Not available
Shore crane
No
--- 
Provisions- Stores
Yes
Notice well in advance required
Dry dock
No
---
Airport
No
---
B.A. chart
Yes
---
Fresh water
Yes
Available by trucks
Repairs
No
---
Medical attention
Yes
At San Nicolás or Nazca
 
 
 
Disclaimer:
All information available in this site, specially in connection with Peruvian ports, has been obtained from public domain sources, port administrations and our own records. Said information is given in good faith and without guarantee. SERPAC AGENCIAS accepts no responsibility for any misunderstanding or variation of said information.